Skip to main content
Building Camp Daniel

Presenting Camp Daniel’s Dining Hall!

By March 10, 2021February 21st, 2022No Comments

Presenting Camp Daniel’s dining hall!

Presenting Camp Daniel’s dining hall! Four years of vision and hard work. We cannot wait to share it with you!
This winter we have spent wrapping up the dining hall. We have finished all of the main construction which is a huge relief and starting tackling the many smaller detail jobs. The last large project was construction of the last large wall. This wall is designed to look like an old loading dock. First was putting up the garage doors, doing woodwork, bricking and mortaring, painting and then distressing! We finished the floors last week, meaning acid washing, dying, sealing the walkways and then installing carpet. A very satisfying job! Our outside-inside design has been fun to create and construct. Most of what is left to finish is putting up signs, decorations and final touches.
Our healthcare center and kitchen is complete. Our health center is stocked and ready for campers! Kitchen equipment and utensils have been put in place and we be have began testing and using the areas to get comfortable before summer camp!
The ally, the area between the dining hall and the theater, now has cobblestone, railings and the hanging lights! We found perfect tables used at the Restore for this area and have refinishing the tops to add to the area come spring.
Up next is finishing Al’s 50’s diner! Heat was installed so working in the winter now possible. This is a project everyone at camp is looking forward to.
Our staff and excellent volunteers are working long hard hours to finish these beautiful grounds, we are excited that these spaces will be used and loved this summer.
SAVE THE DATE: Camp Daniel’s Grand Opening – June 18, 2022. More details coming soon!